ATC West Campus build

The build of the West Campus began in 2019, when the Air Force Civil Engineer Center awarded three projects for construction. The project recently celebrated an important milestone when the steel frame of the dining and classroom facility went up. The facility will feature a full-service commercial kitchen, dining area and support spaces on the ground floor, and eight classrooms with stadium seating on the second and third floors. (U.S. Air Force Photo)

PHOTO BY: U.S. Air Force
VIRIN: 201113-F-ZZ999-301.JPG
FULL SIZE: 0.83 MB
Additional Details

CAMERA

iPad (7th generation)

LENS

iPad (7th generation) back camera 3.3mm f/2.4

APERTURE

12/5

SHUTTERSPEED

1/1538

ISO

25

IMAGE IS PUBLIC DOMAIN

Read More

This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at https://www.dimoc.mil/resources/limitations, which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.